:quality(70))
Installing Kährs Luxury Tile vinyl floors is designed to be efficient and hassle-free. Our Click-joint system allows for a fast, floating installation with a secure, precise fit—ideal for projects that need minimal downtime. For high-traffic or commercial areas, the glue-down method with Kährs Dry Back floors provides extra stability and durability.
To achieve the best results, follow our step-by-step installation guide and preparation tips. With Kährs, you get a seamless, stylish, and long-lasting vinyl floor—installed with ease.
:quality(70))
Proper preparation is key to a successful installation of Kährs Luxury Tiles.
Temperature control: Make sure the room and flooring materials are kept between 64°F and 77°F for at least 48 hours before installation.
Subfloor requirements: Kährs Luxury Tiles can be installed on most clean, dry, solid, and flat subfloors. Remove any wall-to-wall carpet or existing floating floor.
Moisture management: If installing over concrete, RH must not exceed 85%
Radiant heat: turn off the system during installation and bring up to temperature gradually. Surface temperature should not exceed 81 degrees
Following these guidelines ensures a stable, long-lasting installation. Read more about the preparation steps before starting.
Quick tips
:quality(70))
Read and download our guides